School district to host second town hall for September bond referendum

Date:

Share post:

Hopewell Valley Regional School District (HVRSD) is scheduled to host a second town hall and community forum next month on the $87 million bond referendum for district schools.

The virtual community discussion is set for Sept. 9. The referendum is scheduled mid-September on Sept. 17.

- Advertisement -

Superintendent Rosetta Treece said at the school board meeting on Aug. 19 that a panel of people including herself, Robert Colavita, assistant superintendent for Business, and the school district’s architect, will be available in the webinar to answer any questions.

With the referendum, the school district proposes improvements for all six schools in the district – Hopewell Valley Central High School (HVCHS); Timberlane Middle School (TMS); elementary schools – Bear Tavern, Hopewell, and Stony Brook; and Toll Gate Grammar School.

Hopewell Valley Central High School (HVCHS)

The plans for HVCHS are roof replacements in areas to reduce leaks and repairs, accessible restrooms, restoring the pavement of the Solar Canopy parking lot, the addition of a football stadium concession stand, and replacing the obsolete HVAC system in the 400 Wing to improve air quality and energy efficiency.

Timberlane Middle School (TMS)

For TMS, the projects include roofing replacements, replacing select deteriorated exterior doors, adding air conditioning in the auxiliary gym, replacing various HVAC systems, a floor replacement for the auxiliary gym and construction of a synthetic turf field.

Bear Tavern Elementary School

Proposed referendum projects for Bear Tavern consist of roofing replacements, renovating the sewer pumping station, replacing deteriorated doors, replacing various HVAC systems in the main office, cafeteria, media center and music rooms, replacing classroom doors, and modernizing the cafeteria and hallways.

A significant part of the projects proposed is a 10-classroom one-story building addition that would be constructed to move students out of trailers and address a projected increase in enrollment.

The addition will include eight general classrooms, a room for occupational and physical therapy services, and a Child Study Team/Support room.

Hopewell Elementary School (HES)

The HES referendum project includes roofing replacements, replacing of exterior doors, replacement of classroom doors in the primary building, and enlarging two kindergarten toilet rooms to provide ADA (Americans with Disabilities Act) access.

Stony Brook Elementary School

Referendum projects at Stony Brook include roofing replacements, replacement of exterior doors, drainage improvements, installing a new chiller to supplement the existing geothermal system and replacing obsolete HVAC systems.

Toll Gate Grammar School

Toll Gate’s projects include roofing replacements, exterior door replacements, third flood upgrades to the HVAC and DOAS (Dedicated Outdoor Air System), replacing electrical equipment, and building a new six-classroom building addition.

The proposed addition would contain six classrooms with internal restrooms and eliminate the use of trailers for instruction, offices, or storage.

Stay Connected

0FansLike
0FollowersFollow

Current edition

Current Edition – Hopewell Valley News

Related articles

‘They were Americans’

Princeton officials, first responders and residents gathered under bright, sunny skies to honor the memories of the victims...

Hopewell Borough residents petition for public referendum on potential water sale

Hopewell Borough will have a referendum vote on whether they should proceed to pursue the sale of the...

‘It is what we do’

Ray Nagy will never forget the bright blue sky over Lawrence Township and much of the Northeast on...

World Trade Center steel on display at Hopewell Branch library

A piece of steel from the World Trade Center has been moved to Mercer County Library's Hopewell Branch...