School district to host second town hall for September bond referendum

Date:

Share post:

Hopewell Valley Regional School District (HVRSD) is scheduled to host a second town hall and community forum next month on the $87 million bond referendum for district schools.

The virtual community discussion is set for Sept. 9. The referendum is scheduled mid-September on Sept. 17.

- Advertisement -

Superintendent Rosetta Treece said at the school board meeting on Aug. 19 that a panel of people including herself, Robert Colavita, assistant superintendent for Business, and the school district’s architect, will be available in the webinar to answer any questions.

With the referendum, the school district proposes improvements for all six schools in the district – Hopewell Valley Central High School (HVCHS); Timberlane Middle School (TMS); elementary schools – Bear Tavern, Hopewell, and Stony Brook; and Toll Gate Grammar School.

Hopewell Valley Central High School (HVCHS)

The plans for HVCHS are roof replacements in areas to reduce leaks and repairs, accessible restrooms, restoring the pavement of the Solar Canopy parking lot, the addition of a football stadium concession stand, and replacing the obsolete HVAC system in the 400 Wing to improve air quality and energy efficiency.

Timberlane Middle School (TMS)

For TMS, the projects include roofing replacements, replacing select deteriorated exterior doors, adding air conditioning in the auxiliary gym, replacing various HVAC systems, a floor replacement for the auxiliary gym and construction of a synthetic turf field.

Bear Tavern Elementary School

Proposed referendum projects for Bear Tavern consist of roofing replacements, renovating the sewer pumping station, replacing deteriorated doors, replacing various HVAC systems in the main office, cafeteria, media center and music rooms, replacing classroom doors, and modernizing the cafeteria and hallways.

A significant part of the projects proposed is a 10-classroom one-story building addition that would be constructed to move students out of trailers and address a projected increase in enrollment.

The addition will include eight general classrooms, a room for occupational and physical therapy services, and a Child Study Team/Support room.

Hopewell Elementary School (HES)

The HES referendum project includes roofing replacements, replacing of exterior doors, replacement of classroom doors in the primary building, and enlarging two kindergarten toilet rooms to provide ADA (Americans with Disabilities Act) access.

Stony Brook Elementary School

Referendum projects at Stony Brook include roofing replacements, replacement of exterior doors, drainage improvements, installing a new chiller to supplement the existing geothermal system and replacing obsolete HVAC systems.

Toll Gate Grammar School

Toll Gate’s projects include roofing replacements, exterior door replacements, third flood upgrades to the HVAC and DOAS (Dedicated Outdoor Air System), replacing electrical equipment, and building a new six-classroom building addition.

The proposed addition would contain six classrooms with internal restrooms and eliminate the use of trailers for instruction, offices, or storage.

Stay Connected

0FansLike
0FollowersFollow

Current edition

Current Edition – Hopewell Valley News

Related articles

Monthly Column: POW/MIA Recognition Day

National Prisoners of War and Missing in Action (POW/MIA) Recognition Day is observed on the third Friday of...

Big trees, big benefits

by Jay Watson, Co-Executive Director, New Jersey Conservation Foundation If you missed the annual Big Tree Hunt put on by the New Jersey Forest Service this...

County seeks feedback for Local Safety Action Plan

Somerset County is asking residents to provide feedback on the development of a countywide Local Safety Action Plan (LSAP). Residents are...

Is your well water safe to drink? Test with Raritan Headwaters at local events this fall

How safe and healthy is the drinking water from your faucets at home? If your water supply comes...